Recent projects at
Phoenix Electrical Engineering Services Limited
 |
Dark Lane |
Electrical works associated with the
installation of a U.V. filtration plant. For Pierce Contracting |
|
| |
| |
| |
 |
Control Panels | Design & manufacture of five stainless steel control panels complete with
pneumatics. For Yeo Valley |
| |
| |
| |
| |
 |
Lochhead Landfill | Mechanical and Electrical installations for 2 cell pumps, 2 receiving tanks
and 1 upslope riser. |
| |
| |
|
|
|
 |
Deerdykes Phase 2 |
Phoenix have been nominated
to undertake all electrical power, instrumentation, controls and software
for the next 4 composting tunnels on this site. |
| |
|
|
| |
|
|
 |
Douglas Water,
Inverary |
Installation of 4 kilometres of control cabling and services fit out of 3MW
hydro electric generating facility. For Pierce Contracting |
| |
|
|
| |
|
|
 |
Trecatti, Merthyr
Tydfil | Major
upgrade of site wide power supplies and installation of flow meters, ph &
Dox monitors, feed pumps, compressor, blow off valves & major software
upgrade. For Biffa Waste |
| |
|
|
| |
|
|
 |
Parkwood, Sheffield |
New Leachate Treatment
Plant. For Hytech Water. |
| |
|
|
| |
|
|
 |
Bennadrove Landfill |
Upgrade to existing pumping
& installation of "Dlog" S.C.A.D.A interface. |
| |
|
|
| |
|
|
 |
United Mines
Landfill |
Automation of two lane
treatment plant at united mines. |
| |
|
|
| |
|
|
 |
Investor In People |
Phoenix are celebrating
their 10th year as a recognised "Investor In People". |
Deerdykes Composting Facility
|